Project started
October 2023,
| In this episode we weld the neck to the
frame |



| After testfitting the neck on the frame one last time we drilled
some big holes in the neck for plugwelds (using TIG) and thoroughly
cleaned the insides of the sleeves and the parts of the frame
that would slide in there. Just like on the old original frames
we are using silver brazing between frame and neck. |




| Brazing the top tube into the neck was relatively easy as gravity
helped the silver fill the gap. After cleaning we think it looks
really nice! To install the neck and toptube on to the frame which
is fixed in the jig was a bit different, we pre-applied silver
on the tops of the front downtubes and the inside of the sleeves
to make sure all the gaps would be filled up. Before the final
install of the neck we chamfered the edge of the top part of the
seatpost that we had replaced for good weld penetration. We also
added some holes for plugwelds. |


| Next we will finish welding the new part of the
frame to the old part and clean all the welds. |
|