Aad built most of the second manifold live
at the Bigtwin Bikeshow, back home we made some mounting bungs
to support the Stromberg 97 carbs. The bungs needed to be welded
to the crankcase, which is one of the reasons I have not put
the internal parts back in yet. When the other side is also
welded, the crankcases will be gritblasted to give the new mounting
points the same structure as the cast parts, then all will be
glassbeaded, and then after a LOT of cleaning, final assembly
of the engine can start.
|